The Refurbishment is now well under way. Over the first few weeks we have had the noise and the dust with tons of soil being taken out to form what will eventually be the ladies toilets. The picture shows part of the rebuilding which was required to support the seats in the auditorium. The beam used to be in the gents toilets which will eventually be the ladies.  

Refurbishment

 We must apologise to the people who have been trying to get in touch with us. As most of you know we only open mornings but the builders have taken over the whole building and have not been able to let any one on site as currently it is a building site. Also we have at various times lost the phone and the internet but please keep trying to get through we do want to hear from you. E-mail us on blakehay@btconnect.com. The building may not be completely finished in time for the Actors Co next production “Still Life” by Noel Coward but we not be disappointing our regulars so as they say the show will go on.

Advertisement
Categories: Uncategorized
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.